Which option correctly states the outside concrete dust clearance?

Study for the US EPA Model Lead Inspector Test. Utilize flashcards and multiple choice questions with hints and explanations. Prepare for your certification exam with confidence!

Multiple Choice

Which option correctly states the outside concrete dust clearance?

Explanation:
In post-abatement clearance, different outside surfaces have different dust-concentration limits measured in µg per ft2. For exterior concrete, the clearance threshold is 800 µg/ft2, meaning dust on outside concrete should be cleaned down to or below that level. Window wells are treated as a separate surface category with a lower threshold, 400 µg/ft2. Therefore, the correct statement is that outside concrete dust clearance is 800 µg/ft2. The option stating 400 µg/ft2 for window wells is a different surface category, not the exterior concrete, and the idea that both are the same or that neither applies isn’t accurate.

In post-abatement clearance, different outside surfaces have different dust-concentration limits measured in µg per ft2. For exterior concrete, the clearance threshold is 800 µg/ft2, meaning dust on outside concrete should be cleaned down to or below that level. Window wells are treated as a separate surface category with a lower threshold, 400 µg/ft2. Therefore, the correct statement is that outside concrete dust clearance is 800 µg/ft2. The option stating 400 µg/ft2 for window wells is a different surface category, not the exterior concrete, and the idea that both are the same or that neither applies isn’t accurate.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy